47 -- Bonneville Dam PH1&2 Generator Coolers SOL W9127N-17-B-0014PRESOL DUE 112417 POC Stephen M. Yoder, Contract Specialist, Phone 5038084625, Email stephen.m.yoder@usace.army.mil - Stephen M. Yoder, Contract Specialist, Phone 5038084625, Email stephen.m.yoder@usace.army.mil
******* NEW Fiscal Year 2018 SOLICITATION NUMBER - W9127N-18-B-0005*******

******* A NEW Pre-Solicitation Notice Number W9127N-18-B-0005 is now avaialble for this requiement. The requirement is the same, just a new number.*****


Agency: Department of the Army
Office: U.S. Army Corps of Engineers
Location: USACE District, Portland
Classification Code: 47 - Pipe, Tubing, Hose & Fittings
NAICS Code: 332410 - Power Boiler and Heat Exchanger Manufacturing
Size: 750 Employees

W9127N-17-B-0014
Notice Type: Pre-Solicitation
Synopsis:
This is a Pre-Solicitation notice prepared in accordance with Federal Acquisition Regulation (FAR) 5.2 "Synopses of Proposed Contract Actions."
The US Army Corp of Engineers, Portland District, CENWP-CT-S, Portland Oregon 97204 intends to issue an Invitation for Bid for the procurement of 184 Turbine Generator Coolers and subsequent Pressure Tests. The timeframe for the manufacture of these coolers is approximately 14-16 months.
The work includes the manufacture and delivery of air coolers and extra gaskets to replace the existing coolers in use in the generator units in Powerhouses 1 and 2 at Bonneville Damand incidental related work.
a. Field verify existing detail drawings for Powerhouse 1 units 3-10 coolers, taking on-site measurements of a cooler that has been removed from the unit for inspection purposes.
b. Reverse engineer Powerhouse 1 units 1-2 coolers, which are similar to but smaller than the coolersfor units 3-10, taking on-site measurements of a cooler that has been removed from the unit for inspection purposes.
c. Reverse engineer Powerhouse 2 mainunits 11-18 coolers, either taking on-site measurements of spare cooler or shipping spare cooler offsite for inspection.
d. Reverse engineer Powerhouse 2 fish units 1-2 coolers, either taking on-site measurements of spare cooler or shipping spare cooler offsite for inspection.
e. Provide detailed drawings for all four air cooler designs prior to manufacture.
f. Manufacture requiredquantities of coolers for each of the four designs.
g. Manufacture required quantities of extra manifold gaskets for each of the four cooler designs.
h. Deliver coolers and extra gaskets to Bonneville Dam
This solicitation will be a total small business set-aside under NAICS 332410 with a size standard of 750 employees. The Government anticipates awarding One (1) Firm-Fixed-Price contract. An IFB will follow this announcement on or about the 1st - 15th of August 2017.

Direct questions to Steve Yoder, 503-808-4625, email: stephen.m.yoder@usace.army.mil

Point of Contact for small business questions is the Portland District Small Business Specialist Carol McIntyre. Direct: 503-808-4602, email: carol.a.mcintyre@usace.army.mil

CITE: https://www.fbo.gov/spg/USA/COE/DACA57/W9127N-17-B-0014/listing.html

SET-ASIDE: Total Small Business