Construction Of Structures And Facilities

Department of the Army, US Army Corps of Engineers, USACE District, Rock Island, 61204-2004

Y -- Illinois River Basin, Dresden Island Lock, Grundy County, IL Upper Bulkhead Recesses SOL W912EK19R0016PRESOL POC Zachary E. Schuler, Contract Specialist, Phone 3097945443, Email Zachary.E.Schuler@usace.army.milBase Bid: Upper Bulkhead Recesses includes, but is not limited to, disposal of two emergency miter gate leaves, associated anchorages & pintle balls; removal and disposal of pintle ball bases; concrete removal; fabrication, delivery & installation of precast concrete panels, precast concrete recess panels, steel deadman beams, and steel protection plate assemblies; installation of concrete anchors, check post installation, installation of anchor and wall armor, concrete placement, underwater concrete placement, diving operations, installation ofrock dowels and weep holes, and electrical work.

Option A: Miscellaneous Mechanical Fabrications includes, but is not limitedto, fabrication and delivery of bull gear components, bull gear roller components, structural steel framing and grating.

Option B & C: Bull Gear Pit Repairs on the Landwall includes, but is notlimited to, installation of miscellaneous mechanical fabrications; horizontal and vertical concrete removal and concrete placement; installation of structural steel framing; removal, disposal & installation of grating; and electrical work.

Option D & E: Bull Gear Pit Repairs on the I-wall includes, but is not limited to, installation of miscellaneous mechanical fabrications; horizontal andvertical concrete removal and concrete placement; removal, cleaning, painting and reinstallation of structural steel framing; removal, disposal & installation of grating; and electrical work.

Option F: Upper Guidewall Repairs includes, but is not limited to, horizontal concrete removal and concrete placement; fabrication, delivery & installation of steel reinforcing plate; and electrical work.

Estimate Range: $10,000,000.00 to $25,000,000.00

Construciton Days: 350 Consecutive Completion Days

Competition: Unrestricted Full & Open

It is anticipated that the plans and specifications for this project will be available on ww.fbo.gov on or about 19 July 2019. Any contractor wanting the plans and specifications must download them from this website.

Updated July 16, 2019: Updated to include DRAFT Plans and Specifications. Please be advised that these are subject to change and no formal solicitation has been issued at this time.